M4 Boston Manor Viaduct Repairs

Main Steel Sub-Contractor on highly time-critical and high profile repairs on the M4 Boston Manor Viaduct (May to July 2012).

“…a unique repair solution involving the manufacturing of bespoke specialist steel plates and their installation over the crack.”

Highways Agency press release July 13th 2012

Shortlisted as a finalist for the Integration and Collaborative Working category in the 2013 Construction Excellence Awards.

In addition to the pure resilience demonstrated by the entire team, key to the success was the tremendous respect the project team had for each other and their support for the goal of the project. The stabilisation of Boston Manor Viaduct shows what can be achieved when teams work together coherently, safeguarding the structure and minimising the risk of costly and disruptive closures occurring in the future.

Osborne Project Report

Ongoing investigations had revealed unexpectedly severe cracks in the steel structure. These had resulted from fatigue due to the age of the viaduct (opened 1965), stress, and some fabrication flaws.

The urgency of the repairs could not have been greater, the viaduct being part of the Olympic Route Network, carrying coaches to and from Heathrow airport and the Olympic Park. Closure of the M4 threatened to remove one of the key arteries for Olympic traffic.

BS Steels was asked to carry out repairs including a mixture of grinding and manufacture of special steel plates to be bolted above and below cracks to the web. Technical and logistical challenges from the highly complex process for the plates were numerous:

  • In addition to the bolt plates, filler plates were required on both sides, between the structure and the new bolt plates; these had to be milled to match as exactly as possible the unique profile and undulations of the existing structure. This had to be done for around 30 separate locations.
  • The existing structure had to be drilled to highly exacting tolerances. To keep up with demand, drill bits had to be sourced constantly from all over Europe!
  • Each plate had multiple tension control bolts, needing systematic tightening; this could only be done during overnight closures, to eliminate traffic loads.
  • Continuous re-programming of schedule on a daily basis: need for exceptional communication and collaboration between all parties.

The emergency repairs were completed just in time for the Olympics. The Highways Agency received the following message from the Permanent Secretary on behalf of the Prime Minister:

I want to pass on my personal thanks to all those who worked so hard to repair the M4 bridge and get it open again in time for the Olympics. You showed real determination to get the job done in time, working through the night to do so. I was delighted to get the news very early this morning.

Permanent Secretary on behalf of the Prime Minister

Contact Us

For all your project and every day steel needs:

Phone: 02392 673778
E-mail: structural@bssteels.co.uk

Or use our Contact Form:

We promise that your details will be used only for the purpose of your enquiry and will not be shared with third parties.

Related Projects

Gade Valley Viaduct Christmas 2020 Possession

Osborne magazine article: Christmas 2020 works at Gade Valley Viaduct

Extensive experience of complex weld repairs, and of collaboration with all partners involved, delivered successfully within a 54-hour timescale.

Adur Ferry Bridge, Shoreham Harbour

adur ferry bridge shoreham-on-sea

BS Steels provided a range of steel fabrication and on-site services for this iconic local landmark.

M25 Repair and Steelworks Projects

M25 motorway - BS Steels works

Since 2012, BS Steels’ teams have been working almost constantly on a variety of projects on and around the M25.

M25 Gade Valley Viaduct Repairs

underside of M25 gade valley viaduct showing strengthening plates fitted by bs steels

Multi-year project strengthening the welds on the underside of the viaduct spans on the M25 Gade Valley Viaduct. BS Steels’s longest continuous project, with a dedicated team likely to be on site for several years.

Marcon Place Underbridge Reconstruction

new parapet marcon place railway bridge designed fabricated and installed by bs steels

Design, manufacture and installation of parapets for new railway bridge, with extremely tight on-site timetable.