Adur Ferry Bridge, Shoreham Harbour

An impressive new structure, with a 50-metre rotating central span, was opened in 2013, replacing the previous 1920s narrow concrete footbridge. It accommodates pedestrians, cyclists and wheelchair/mobility scooter users.

BS Steels is proud to have been involved in this iconic local landmark. Working with project leaders Osborne, BS Steels provided steel bracing to maintain the old bridge for traffic during early stage works on the replacement. We also provided various other on-site services, including extensive welding, cutting and fabrication. Our steel fabrication services were called upon to create both permanent and temporary platforms for piling rigs, and for access to all the main monopiles, including that supporting the central section. We also created the navigation light support brackets, and were called in to assist with manufacture and installation of the stainless steel balustrades.

The video gives an excellent introduction to the bridge and some of the engineering challenges met during the project, including tidal extremes of up to 7 metres!

Contact Us

For all your project and every day steel needs:

Phone: 02392 673778
E-mail: structural@bssteels.co.uk

Or use our Contact Form:

We promise that your details will be used only for the purpose of your enquiry and will not be shared with third parties.

Related Projects

M25 Repair and Steelworks Projects

M25 motorway - BS Steels works

Since 2012, BS Steels’ teams have been working almost constantly on a variety of projects on and around the M25.

M4 Boston Manor Viaduct Repairs

steel plates manufactured and installed by BS Steels for M4 motorway viaduct repair

Exceptionally time-critical repairs to motorway viaduct on one of 2012 Olympics’ main arteries. Techniques since been employed elsewhere including M25 Gade Valley Viaduct

Gade Valley Viaduct Christmas 2020 Possession

Osborne magazine article: Christmas 2020 works at Gade Valley Viaduct

Extensive experience of complex weld repairs, and of collaboration with all partners involved, delivered successfully within a 54-hour timescale.

M25 Gade Valley Viaduct Repairs

underside of M25 gade valley viaduct showing strengthening plates fitted by bs steels

Multi-year project strengthening the welds on the underside of the viaduct spans on the M25 Gade Valley Viaduct. BS Steels’s longest continuous project, with a dedicated team likely to be on site for several years.

Marcon Place Underbridge Reconstruction

new parapet marcon place railway bridge designed fabricated and installed by bs steels

Design, manufacture and installation of parapets for new railway bridge, with extremely tight on-site timetable.