Motorway Viaduct Repairs, Boston Manor

Motorway viaduct repairs, M4 Boston ManorMain Steel Sub-Contractor on highly time-critical and high profile repairs on the M4 Boston Manor Viaduct. Repairs including a mixture of grinding and manufacture of special steel plates to be bolted above and below cracks. Numerous technical and logistical challenges overcome to enable completion just in time for the 2012 Olympics.
Visit project report…

London Gateway, Reception Building

Reception Building, London GatewayDesign, fabrication and installation of steelwork for reception building of the UK’s newest deep-sea container port and Europe’s largest logistics park. The steelwork is fully on view behind glass curtain walling, and the reception building will be one of the most prominent buildings on the site. So BS Steels’ handiwork, including some very special engineering, will be on show to all.
Visit project report…

Ferryspeed Distribution Depot, Jersey

link image to Ferryspeed Jersey project Conversion and extension of former Condor Ferries warehouse. Warehouse refitted to enable delivery, loading and storage in optimum temperature-controlled conditions. Included strengthening and adapting of existing structures; installation of cold and chilled store supporting structures; steel mezzanine floor extensions; new loading docks; new steel canopy; scissor lifts for loading double deck trailers.
Visit project report…

Railway Parapet, Marcon Place, London

railway parapet steelwork, Marcon Place, HackneyDesign, manufacture and installation of new railway bridge parapet within a very challenging timescale. Over Easter Bank Holiday 2013, seven independent rail bridges supporting four tracks and four platforms at Hackney Downs Station were demolished and reconstructed – all within 99 hours.
Overall project ‘Highly Commended’ in 2013 Network Rail Partnership Awards.
Visit project report…

St Paul’s House, London EC4

refurbishment of St Paul's House, London EC4Complex refurbishment of office block. Basement completely revamped, ground floor lowered to existing pavement level. New steel staircases, creation of service voids through ground, first, second, third, fourth, fifth floors. New steel sixth floor with a roof over. Infilling of a terrace from 4th floor to 6th floor creating additional floor areas. Modifications to fire service lift and twin tenants’ lift shaft.
Visit project report…

North Kent Community Church

erection of North Kent Community ChurhManufacture and erection of steel superstructure for North Kent Community Church, in the new community of Springhead Park, Ebbsfleet.
BS Steels’s erectors worked to schedule through some of the worst winter weather experienced for many years.
Visit project report…

HMS Temeraire, Portsmouth

mezzanine floor, HMS Temeraire Refurbishment of C19 listed building. Steel mezzanine, stairs, balustrades, and glazed steel entrance canopy designed, manufactured and installed by BS Steels. Client’s goal was to make better use of The Old Gymnasium, whilst preserving the integrity of the Grade II listed building. The building now houses three offices, a modern reception area, five championship squash courts with viewing gallery and a fully fitted gym and weights area.
Visit project report…

131 Shoreditch High St, London E1

steelwork including stainless steel staircase, shoreditch high street londonMixed retail and residential refurbishment in East London. Structural steel manufactured and installed for new floor layouts. Architectural features included spiral staircases in mild and stainless steel, designed, fabricated and installed by BS Steels from original architectural concept. Steel features within new retail area, and stainless steel balustrading, stainless steel planters, and security fencing on new rooftop terrace.
Visit project report…

Portsmouth Central Mosque

installation of new mezzanine floor, portsmouth central mosqueInstallation of a new mezzanine floor at Portsmouth Central Mosque. Installation of primary floor beams, weighing up to 1.25 tonnes each, removal of existing wooden trusses after construction of floor by main contractor, installation of Structural Hollow Section frames within ceiling line.
Visit project report…