Portsmouth Central Mosque

Project in Portsmouth, at the Portsmouth Central Mosque. The Mosque was converted to include a first floor, thus enabling both male and females to attend Mosque simultaneously but separately.

The photographs depict the delivery and installation of the primary floor beams, weighing up to 1.25 tonnes each. The main contractor Lisbon PD Limited then constructed the first floor, following which BS Steels then removed the existing green wooden trusses and supplied and installed Structural Hollow Section frames in place of the timber, which were located into the ceiling line to provide adequate head room.

CLIENT: Lisbon PD Ltd

  • BS Steels delivery at Portsmouth Central Mosque
  • Unloading at Portsmouth Central Mosque
  • BS Steels starting installation at Portsmouth Central Mosque
  • Steels in place at Portsmouth Central Mosque
  • BS Steels securing beans in place at Portsmouth Central Mosque
  • Steels installed by BS Steels, ready for new floor above
BS Steels delivery at Portsmouth Central MosqueUnloading at Portsmouth Central MosqueBS Steels starting installation at Portsmouth Central MosqueSteels in place at Portsmouth Central MosqueBS Steels securing beams in place at Portsmouth Central MosqueSteels installed by BS Steels, ready for new floor above